Skip to main content skip to main navigation.
Hang drywall gap from floor.
You ll also speed up your job by using 12 ft long sheets of drywall rather than standard 8 footers bottom.
Find a store near me.
Charlie the j bead isn t there to fill in a gap.
Order status lowe s credit.
Always leave a 1 2 inch gap at the floor.
For large jobs have the drywall delivered.
This will simplify the attachment of the drywall panels to the framing.
Gaps are the inevitable result of not installing drywall in the right order which is ceilings then upper walls then lower walls.
This allows for floor and wall expansion without cracking the drywall.
The j bead just gives you a nice straight termination that is durable.
It also helps prevents moisture wicking if.
Sheets is difficult and getting them into the house can be challenging.
Our video covers the basics of hanging drywall on studs.
The actual reason for the 1 4 at the bottom in truth it is 3 8 in a perfect world is very simply to allow for typical variances in the measurements between the floor and the ceiling.
The first step to hanging drywall is to take a pencil and mark on the floor and ceiling the placement of the vertical studs.
Many drywall suppliers will even stack the drywall in the house for an extra fee.